Commercial Telecoms

Latest News

Read some of the stories from all around Heathrow

Commercial Telecoms customer projects highlights

Published: 07/04/2019  General

We take the opportunity to highlight a few of the most recently completed projects which range from office refurbishments to relocations to installation of new services.

Our dedicated Account Managers and Minor Works team have worked in close collaboration to deliver to your specifications, even when deadlines were tight, and sometimes the scopes were changed because we care about your business as much as you do.  

Menzies Aviation UK Ltd. - 4G Solution at Electra Avenue
We welcome Menzies as our first 4G Wide Area Mobile Data commercial customer.
When Menzies required a data network solution at Electra Avenue adjacent to Boadicea House on Eastchurch Road, our WAMD solution was the best-fit cost-effective solution for them. Commercial Telecoms first carried out a 4G cellular site survey to ascertain the suitability of the solution. Following a positive survey outcome, our team fulfilled the provision of the WAMD solution by the configuration of the Access Point (AP) to provide a wired network port, installation of a 4G mobile unit and new AP, and finally with the configuration and deployment of the Menzies’ specific SSID.
 
Menzies has also opted for our 4G WAMD as their data network solution at Ensign Close adjacent to Vanguard House on Eastchurch Road; another of their remote location within the Heathrow estate.
 
Virgin Atlantic – Terminal 3
Virgin Atlantic's project to increase network resilience T3 required the installation of new fibre with in-building patching. Our team scoped and delivered the project incorporating changes along the way to fit in with the overall requirements.
 
British Airways Plc. (BA) – Terminal 5
Commercial Telecoms has completed a composite project involving the relocation of existing services and reconnection of dedicated assets such as PC's and phones; to establish an integrated Hub Management Center in T5 for BA. We are pleased to have fulfilled the project which required scheduling and providing resources as requested by the Airline. The positive feedback on our End of Job survey exemplifies our best endeavours.
 
American Airlines (AA) – Terminal 3 Gates 323 and 325
Commercial Telecoms installed and terminated new fibre and copper from AA’s comms rooms to each site as per AA’s scope, liaising with the key customer contact as requested for each phase of work completion. This was for AA’s refurbishment project supporting operations teams across their lounge, maintenance office, landside office and store.
 
Japan Airlines Co. Ltd (JAL) – Terminal 3
Commercial Telecoms has helped with the decommissioning and installation of services for JAL’s office relocation from D'Albiac House to South Office Block in T3.  The relocation project involved surveys for Wi-Fi Access Points (APs), termination and patching of fibre connections to JAL’s server room, WLAN bridge mode design, installation and connection of APs to comms room, reconnection of Broadband, IPTV and IP Telephony
 
Louis Vuitton – Terminal 4
 
Commercial Telecoms delivered the following products and services for the luxury fashion brands new store in T4, so keep their connected:
  • Wireless design extension, wireless survey and Access Points for the store
  • 10Mb Premium Broadband and 20Mb Standard Broadband with public static IPs
  • Installation of a fibre link circuit from their store to the stockroom
  • Installation of  advanced IPTelephony handsets